Cabinet Member Signing - Monday, 10 August 2026 - 2.00 pm

August 10, 2026 at 2:00 pm Cabinet Member Signing View on council website

Chat with this meeting

Subscribe to our professional plan to ask questions about this meeting.

“What's the new cost for Broadwater Farm Estate works?”

Subscribe to chat
AI Generated

Summary

Open Council Network is an independent organisation. We report on Haringey and are not the council. About us

Councillor Dixie-Ann Joseph, Cabinet Member for Placemaking, approved a variation to the contract sum and programme for the Broadwater Farm External Major Works Programme. This decision was made to address necessary repairs and ensure the buildings remain safe and compliant with current regulations.

Major Works Programme Broadwater Farm Estate

Councillor Dixie-Ann Joseph approved a variation to the contract sum and programme for the Broadwater Farm External Major Works Programme. This decision was made to prevent further deterioration of key external and some internal building elements on the estate while a wider refurbishment programme is developed. The approved variation includes the anticipated final account position, detailing the principal cost drivers and the commercial controls applied to ensure value for money.

The Broadwater Farm External Major Works Programme was initiated to address identified works on eight blocks, including concrete repairs, balcony waterproofing, renewal of internal flooring, sandblasting, drainage repairs, and redecoration with an A2 fire-rated coating. These measures are intended to ensure the buildings remain safe, weathertight, and compliant with current fire-safety regulations, thereby preventing increased safety risks, accelerated asset deterioration, and additional pressure on the responsive repairs budget.

Alternative options considered included doing nothing, which was discounted as a contractor was already appointed and works were in progress, and pausing the works to complete them as part of a full estate regeneration. The latter was also discounted due to the lengthy timescales involved in the wider regeneration programme and the unacceptable risk of continued deterioration during the interim period.

The need for the variation arose after the contractor commenced work and gained full access, revealing previously concealed defects and constraints. This necessitated further surveys, revised methodologies, and scope changes to ensure compliance with statutory requirements, including fire safety legislation for Higher Risk Buildings1 and the adoption of A2-rated fire-compliant coatings. Intrusive surveys and associated remedial works to address concealed defects, along with programme extensions, also contributed to the increased costs.

The report highlighted that the original scope was based on visual, non-intrusive surveys, and full regulatory assessments were not undertaken at the tender stage. Once on site, issues such as asbestos and lead-based paint surveys, intrusive concrete testing, structural assessments, fire risk mitigation actions, security and access control upgrades, and changes to external materials to meet fire safety standards became apparent. These factors collectively resulted in increased costs and a programme extension, with completion now anticipated in April 2027.

The Council has a Public Sector Equality Duty2 under the Equality Act 2010, requiring due regard to eliminate discrimination, advance equality of opportunity, and foster good relations between people who share protected characteristics. The decision primarily impacts residents of Haringey Council-owned properties, a significant number of whom share protected characteristics, with BAME and disabled people being overrepresented in the council housing stock. The scope of works will be adapted where residents have disabilities, and engagement with residents will take place to identify specific needs. The contractor is also required to adhere to the Public Sector Equality Duty.


  1. Higher Risk Buildings are defined by the Building Safety Act 2022 as buildings that are at least 18 metres tall or have at least seven storeys and contain at least two residential units. 

  2. The Public Sector Equality Duty requires public authorities to have due regard to the need to eliminate discrimination, harassment, victimisation and any other conduct prohibited by the Equality Act 2010; advance equality of opportunity between people who share a protected characteristic and those who do not; and foster good relations between people who share a protected characteristic and those who do not. 

Delegated decisions linked to this meeting

Decision summaries below are AI-generated from the council’s published record. Check the council source or the full decision page before relying on them.

  • The Cabinet Member Signing of Haringey Council approved a variation to the contract sum and programme for the Broadwater Farm External Major Works Programme on 10 August 2026. This included approving the anticipated final account position, principal cost drivers, and commercial controls. The decision also approved concrete repairs, balcony waterproofing, internal flooring renewal, sandblasting, drainage repairs, and redecorations using an A2 fire-rated coating.

Attendees

Profile image for Councillor Dixie-Ann Joseph
Councillor Dixie-Ann Joseph Cabinet Member for Placemaking Green Tottenham Central

Topics

Public Contract Regulations 2015 Broadwater Farm External Major Works Programme Equality Act 2010 Affordable Housing Fire Safety

Meeting Documents

Agenda

Agenda frontsheet 10th-Aug-2026 14.00 Cabinet Member Signing.pdf

Reports Pack

Public reports pack 10th-Aug-2026 14.00 Cabinet Member Signing.pdf

Additional Documents

BWF External Major Works Programme Variation FINAL.pdf
Decisions 10th-Aug-2026 14.00 Cabinet Member Signing.pdf
Printed minutes 10th-Aug-2026 14.00 Cabinet Member Signing.pdf