Earl Street Public Realm Improvement Scheme Update

October 21, 2026 Cabinet (Cabinet collective) Key decision Awaiting outcome View on council website
Full council record

Purpose

To seek approval of the concept design as the basis for progressing to RIBA Stage 3 detailed design, further stakeholder engagement and procurement of the construction contractor. The preferred design responds to the operational and physical constraints of Earl Street while seeking to create a welcoming, accessible and greener Restaurant Quarter with the Hazlitt Theatre at its heart.

Decision

That the concept design as the basis for progressing to RIBA Stage 3 detailed design, further stakeholder engagement and procurement of the construction contractor be approved.

Reasons for the decision

In January 2026, Cabinet approved the investment into a public realm improvement scheme focused on Earl Street, Maidstone to create a Restaurant Quarter with reduced vehicle prominence, outdoor dining and increased greening.

Following that decision, the procurement of a design team was completed and an Employer’s Agent, Urban Designer including Stakeholder Engagement, Transport Planner and Civil Engineer were appointed.

The full Stage 2 RIBA report is attached in Appendix 1 to the report.

Stakeholder Engagement

Between May and July, ahead of school holidays, stakeholder engagement was carried out including an online survey, business 1:1s and walkabout, inclusive design assessment and World Café workshop.

The online survey received 834 responses of which 83% were Maidstone residents and 10% lived in the Town Centre. Respondents were asked how they would want Earl Street improved and the highest response was for more greening and planting (82%). Other improvements included more accessible pavements and inclusive design (77%), reduced traffic (76%), improved road safety (76%) and more outdoor seating (72%). The most common theme from the general comments captured in the survey was support for changes and traffic-free spaces and 70% of respondents agreed the changes would encourage people to spend more time in Earl Street.

Overall, the survey indicated a strong level of support for the scheme, a recognition of the challenges relating to traffic movements and a relatively low level of safety concerns, with only 22% indicating they had personal safety concerns.

Traffic Data

Traffic data was collected over the week of 13 July 2026 using cameras. This recorded pedestrian and vehicle movements.

Pedestrian data showed that movement peaked at around 1pm with the central area of Earl Street seeing some increases in movement around 5pm and 9pm. The image below shows a summary of the data obtained.

Traffic data captured weekday and weekend movements within Earl Street and is represented in the graphs below. This showed a spike in activity around midday and then again around 7pm. However, most of the vehicles were using the no-stopping zones where vehicles should not be present indicating that the road is being used for drop-offs or prohibited parking.

Finally, the data analysed the number of daily stays, overall occupancy, time at maximum capacity and legitimate occupancy.

The table on the following page shows the average parking patterns captured along Earl Street.

It indicates that for the disabled bays the overall occupancy peaked at 55% at weekends and fell to only 14% on weekday evenings. The time at which the bays were at maximum capacity was only 33% during the weekend, 27% during weekdays and never reached maximum capacity during the evenings.

Of the three loading bays on Earl Street, the two closest to Week Street had greater usage than the one closest to Fairmeadow, which appears to correlate to business occupancy and concentration along the road. Whilst occupancy ranged from 22% to 45%, with maximum capacity ranging from 0.5% to 32%, the legitimate occupancy was far lower at only 2% to 16% of stays. This demonstrates that all the bays are being misused and that legitimate loading is far lower than the current arrangements cater for.

Finally, the taxi rank showed the overall occupancy ranged from 23% to nearly 40% and was at maximum capacity for 20% of the time during weekday evenings.

Concept Design

The concept design has built upon the data captured to determine the preferred spatial layout as well as create a visual identity for the street.

The key aspects of the concept design are:

Physical Barrier – the traffic data and experience from King Street has shown that a physical barrier is essential to provide security for a pedestrianised zone and ensure outside dining can be delivered safely and without the risk of traffic manoeuvring through the area. Therefore, the concept design retains a physical barrier, however the location and style will be changed from the existing HVM gate currently at the top of Earl Street

Timed Pedestrian Access – supported by the physical barrier, a timed pedestrian zone will be extended along Earl Street to the Royal Star Arcade car park entrance. Due to the presence of this private car park, it is not possible to restrict access on Earl Street as far as Pudding Lane. The timings of the pedestrianisation will form part of the next stage of development and will require further engagement and discussion with Kent County Council.

Linear Paving Bands – taking reference from the historical plot lines and narrow frontages, as well as the theatre’s closing curtains, the concept for Earl Street is to use linear paving in bands which converge and intensify around the Hazlitt Theatre to create a strong civic focus before gradually dispersing towards Week Street and Pudding Lane. This puts the Theatres at the heart of the street, drawing people in to create a primary destination.

Theatre Square – the creation of Theatre Square as a singular “heart” of Earl Street, with the opportunity for performance space, flexibility for events and reinforcing a sequence of interconnected public spaces including Jubilee Square, Remembrance Square and the new Gateway Square.

Gateway Square – the concept starts and concludes with a new square at its entrance, celebrating the history of Maidstone along with public art, interpretation and community-led design. This will create its own identify for Earl Street, a welcoming entrance which also created a more legible and connected public realm network leading into Fremlin’s Walk, Market Buildings and Royal Star Arcade.

The plan below outlines the key spatial aspects of the concept design between Pudding Lane (lefthand side) and Week Street (righthand side).

The visuals below, also included in Appendix 1 to the report, provide an artist’s impression of the view looking up Earl Street and an aerial view of whole design. The planting and specific material choice and colour are indicative and do not represent the final detailed design.

The Planning and Communities Policy Advisory Committee considered and supported the matter at its meeting on 7 October 2026.

Alternative options considered

Option 2: The Cabinet could amend the concept design.

Option 3: The Cabinet could agree that the project is not continued.

These options were not selected, as they would be unlikely to deliver the ambition of the survey respondents or create a distinct, but heritage inspired design. Also, ceasing work at this stage would undermine the Council’s objective to deliver a High-Quality Place adapted for a Changing Climate.  In making the decision, the Cabinet supported the project’s progression, highlighting that it had significant support and will improve both accessibility of the area and the viability of the local economy.

Supporting Documents

Earl Street Public Realm Improvement Scheme Update.pdf
Appendix 1 - RIBA Stage 2 Report.pdf

Details

ReferenceCall-ins0
OutcomeFor Determination
Decision date21 Oct 2026
Effective from31 Oct 2026
Expected date21 Oct 2026
Originally due21 Oct 2026
Subject to call-inYes