1st Calling 26/0011/LRB, Argyll and Bute Local Review Body - Thursday, 26 November 2026 4:00 pm
November 26, 2026 at 4:00 pm Argyll and Bute Local Review Body View on council websiteSummary
Open Council Network is an independent organisation. We report on Argyll and Bute and are not the council. About us
Argyll and Bute Local Review Body was scheduled to consider a single planning review, concerning standing stones already installed in the grounds of Barcaldine Castle at Benderloch near Oban. The review was scheduled to consider whether to overturn the refusal of retrospective planning permission recorded in the papers, after the planning authority had also served an enforcement notice requiring the stones to be removed.
Barcaldine Castle standing stones review
The scheduled item was listed as Notice of Review Request 26/0011/LRB, for Barcaldine Castle, Benderloch, Oban, PA37 1SA, relating to planning application 26/00157/PP.1 The papers were included in the Public reports pack for the meeting scheduled for 26 November 2026, and the Agenda frontsheet.
The proposal was described in the papers as the installation of standing stones and associated works, including engineering operations, on a part-retrospective basis.2 The applicant was David Whitehead, proprietor of Barcaldine Castle, with Cameron Sutherland of Bracewell in Oban acting as agent for the original application and John Russell of Interurban Developments Ltd acting as agent for the review.
The development comprised 15 stones in a circle — 13 stones forming an outer ring and two at the centre, each around 2 to 2.5 metres high — together with a post-and-wire fence, access gate, narrow slabbed path, benches and a proposed gravel path. The application form stated that work had started on 1 December 2025 because the applicant was unaware that planning permission and listed building consent were required. The council's report said the application followed complaints and a planning enforcement investigation.
Barcaldine Castle is a Category A-listed building, built between 1595 and 1610, and the site is in the Lynn of Lorn National Scenic Area with views towards Loch Creran and the Glencoe Mountains.3
The papers recorded that planning permission had been refused on 11 August 2026 for one reason: that the design, siting and materials were inappropriate for the sensitive historical and cultural setting and failed to respect, preserve or enhance the character of the listed castle, contrary to National Planning Framework 4 Policies 07 and 14 and Local Development Plan 2 Policies 05, 10, 15 and 16.4 The officer's report of handling was scheduled to be considered alongside the review, and it recommended refusal, but the papers did not show whether that recommendation was to be followed or overturned by the Local Review Body.
The planning authority's response, dated 27 October 2026, was scheduled to ask the Local Review Body to dismiss the review and uphold the refusal. It said no new information had been raised by the applicant that was not already covered in the report of handling, and that a hearing was not required. It also noted an enforcement notice, reference 26/00140/ENOTH1, served on 2 October 2026 and due to take effect on 5 November 2026, requiring removal of the 15 stones and restoration of the land within three months, subject to any appeal.5
The applicant's case in the review papers
The applicant's review statement was scheduled to argue that the stones should be understood as a contemporary commemorative landscape feature, not as an attempt to imitate genuine prehistoric archaeology. It said the 13 outer and two inner stones represented 13 February, the date of the Glencoe Massacre, and that Barcaldine Castle had historical associations with events leading up to the massacre.
The statement disputed the officer's assessment on the setting of the castle and on design:
The Castle remains clearly legible as the dominant historic and architectural feature, while its relationship with the surrounding rural landscape, Loch Creran and the Glencoe Mountains remains apparent.
On design, the applicant was scheduled to say the spacing between stones retained visual permeability, the castle remained visually dominant in wider views including from the approach from Ferlochan, and the warmer-coloured sandstone was a separate contemporary intervention rather than an attempt to replicate the castle's grey stone fabric. It also noted that the officer had not found significant harm to the special qualities of the National Scenic Area, and that the path, seating, fencing and gate had been considered relatively low-impact and acceptable.
The original supporting statement for the application had presented the stones more in tourism terms — as a feature for guests, weddings and photography, with hidden outdoor speakers playing Gaelic music — before the memorial explanation was given to officers. The officer's report said it was not persuaded that the later justification outweighed harm to the setting.
Consultations and representations
Historic Environment Scotland was recorded as saying it had no comments, but that this should not be taken as support. West of Scotland Archaeology Service was recorded as saying it would prefer the circle not to be constructed, because a modern pastiche in an area rich in genuine prehistoric antiquities risked undermining their significance and causing confusion, although it said it was not aware of a specific policy that would preclude such a monument. The former conservation officer was recorded as advising strongly against the development, describing imitation standing stones in the grounds of a late 16th-century A-listed castle as raising issues of principle rather than detail.
Six representations were summarised in the report: two neutral, one in support and three in objection. The neutral responses included one from David Orr of Cladach, Benderloch, raising access and parking questions, and one from Oban District Access Panel supporting the project but asking for disabled parking and non-slip surfacing. The supporter was Colin Mackenzie of Edinburgh. Objectors included Kate Campbell, John Maxwell of Dalintober Farm, Benderloch, and James Stewart of Dunavon, Connel.
The review papers also included further comments from interested parties. One objector was scheduled to argue that the memorial justification had emerged only after the council raised concerns, that there had been no consultation with the MacDonalds of Glencoe or Campbells of Argyll, and that a plaque would not prevent misunderstanding by visitors passing the grounds or viewing images on social media. Colin Mackenzie, by contrast, was scheduled to ask that his full statement of support be included, arguing that contemporary standing stones could encourage visitor engagement — citing the Sighthill stone circle in Glasgow — and suggesting retention subject to conditions on ground restoration, biodiversity and management, rather than removal.
Other matters covered in the report of handling included biodiversity, where the council's Biodiversity Officer had sought enhancement measures for loss of gorse habitat, which officers said could be secured by condition, and roads and access, where there was no response from the Roads Authority and no discernible impact was identified.
The scheduled business also listed apologies for absence and declarations of interest, with no detail given in the agenda of any apologies or interests to be recorded.
-
The agenda listed the item as
Consider Notice of Review Request: Barcaldine Castle, Benderloch, Oban, PA37 1SP (Ref: 26/0011/LRB)
with supporting documentation and comments from interested parties. ↩ -
Part retrospective
means permission was sought after some of the work had already been carried out, to regularise what was already in place. ↩ -
Category A listing is the highest level of listing for a building in Scotland, for nationally important buildings of international importance. A National Scenic Area is a nationally important landscape designated for its scenic qualities. ↩
-
National Planning Framework 4 (NPF4) is Scotland's national planning policy, adopted in February 2023. Local Development Plan 2 (LDP2) is Argyll and Bute Council's adopted local plan. Policy 07 of NPF4 covers historic assets and places, Policy 14 covers design, quality and place, and LDP2 Policies 15 and 16 cover the historic environment and listed buildings. ↩
-
An enforcement notice is a formal notice under the Town and Country Planning (Scotland) Act 1997 requiring unauthorised development to be removed or remedied, with penalties for non-compliance. ↩
Attendees
Topics
Meeting Documents
Additional Documents