Building 10, Station Way, Royal Arsenal Riverside, Woolwich SE18 6SU - Ref: 25/4134/F & 25/4135/L

April 14, 2026 Planning Board (Committee) Approved View on council website

This summary is generated by AI from the council’s published record and supporting documents. Check the full council record and source link before relying on it.

Summary

The Planning Board decided to grant full planning permission and listed building consent for the installation of Air Source Heat Pumps in Building 10, Station Way, Royal Arsenal Riverside. This decision was made on 14/04/2026. The decision included conditions regarding noise monitoring, surface water drainage, post-construction energy monitoring, demolition and construction management, construction logistics, noise levels, works details, lighting strategy, bird boxes, brickwork, and cold plume analysis.

Full council record

Decision

Resolved that full Planning Permission and Listed Building Consent be GRANTED for the proposed installation of Air Source Heat Pumps in the eastern portion of Building 10, specifically within the commercial floorspace in units 9 and 10, previously approved under planning permission 21/2055/F, with other associated works to the internal and external elements of the building, to support the decarbonisation of the existing energy centre as part of the overall strategy for Royal Arsenal Riverside

Consent subject to the Conditions set out in Appendix 2 of the report and its addendum in respect of Ref 25/4134/F and Appendix 3 of the report in respect of Ref 25/4135/L with an additional informative in relation to Ref 25/4134/F requiring that

-       Residents are informed of where the noise monitoring locations will be and what the outcome of the monitoring is to provide reassurance that the maximum noise levels are not exceeded.

That the Assistant Director (Planning & Building Control) to make any minor changes to the detailed wording of the recommended conditions as set out in the Appendix 2 and Appendix 3 of the report, its addendums and the minutes of this Planning Board meeting, where the Assistant Director (Planning & Building Control) considers it appropriate, before issuing the final decision notice.

Related Meeting

Planning Board - Tuesday, 14th April, 2026 6.30 pm on April 14, 2026

Supporting Documents

Building 10 Station Way Ref- 25-4134-F 25-4135-L PB.pdf
Item 7 - Addendum to Building 10 Station Way Ref- 25-4134-F 25-4135-L PB.pdf
Appendices to Building 10 Station Way Ref- 25-4134-F 25-4135-L PB.pdf

Details

OutcomeRecommendations Approved
Decision date14 Apr 2026